Manufacturing Maintenance and Production Scheduling
Choose whether, when and how to maintain an asset while balancing failure risk, throughput, labor and spare parts.
A prepackaged, versioned demonstration, not a client engagement. Added only after idempotent action execution and operational event handling have been tested.
Agentic flow
From signal to governed action
- Sensor and event data
- Diagnose asset state
- Retrieve manuals and history
- Simulate maintenance windows
- Optimize schedule
- Supervisor approval
- Issue work order
Condition signals are diagnosed against manuals and failure history before candidate windows are simulated for failure risk, throughput loss, labor and spare parts. The schedule is optimized, but a supervisor signs off before any work order reaches the plant floor.
- Agent step
- Approval or policy gate
- Side-effecting action
Nodes in the state graph
- 01Diagnose asset state
- 02Evidence verifier
- 03Scenario modeler
- 04Decision optimizer
- 05Risk gate
- 06Executor
- 07Outcome monitor
Specification
How the decision is made and governed
- Tools
- Sensor historian, maintenance system, manuals, inventory, production schedule and work-order API.
- Decision model
- Failure probability and remaining useful life; discrete-event production simulation; constrained maintenance scheduling.
- Approval gate
- Supervisor approval for production interruption, safety-critical maintenance or spend above threshold.
- Primary metrics
- Avoided failure loss, throughput, schedule adherence, false-alarm cost, downtime, approval accuracy and work-order confirmation.
Failure injection
What the demo deliberately breaks
Injected failures
- Sensor drift
- Stale maintenance history
- Unavailable part
- Duplicate work order
- Maintenance window that violates a safety rule
Showcase pseudocode
case = observe_asset(asset_id)
plan = planner.plan([diagnose, retrieve_history, simulate_windows, optimize])
evidence = verify(retrieve_manuals_and_cases(case))
failure_dist = predict_failure(case.sensors, evidence)
windows = simulate_production(maintenance_options, failure_dist)
proposal = optimize(windows, constraints=[safety, labor, parts, demand])
if proposal.safety_critical or proposal.downtime > limit:
return request_supervisor_approval(proposal)
return create_work_order_once(proposal)Build it yourself