Skip to content
Duoduo Mediaevidence to decision

Package 01 · Section 4.1

Decision Contracts and System Boundaries

Translate an ambiguous request such as improve supplier selection into an auditable AI decision-system contract.

Track
A · Decision and evidence foundations
Level
Foundation
Version
v1.0
Status
Open · initial release
Explanation depthDepth

Learning objectives

  • Distinguish question answering, prediction, causal estimation, optimization and approval decisions.
  • Define decision owner, action set, utility, constraints, evidence standard, latency and escalation.
  • Identify what the AI may recommend and what remains a human responsibility.

In brief

Most AI projects fail before the first model call because nobody wrote down what decision the system supports. A decision contract names the owner, the actions available, how outcomes are valued, the constraints that cannot be traded away, the evidence required and when the system must stop and hand over to a person.

Core concepts

01.1Decision versus answer

An answer is a statement that can be true or false. A decision is a commitment to an action whose consequences depend on a state of the world you only partly observe. "What is the supplier lead time?" is an answer. "Which supplier should we award the Q3 contract?" is a decision.

Five system types recur: question answering, prediction, causal estimation, optimization and approval. They need different evidence and different metrics. A system that answers accurately can still recommend badly if the objective is incomplete.

01.2Contract anatomy

A complete contract has eleven fields: owner, decision, action set, outcome, utility, constraints, evidence standard, uncertainty treatment, latency, abstention and escalation. Each field must be testable by someone who did not write it.

Loss is rarely symmetric. Approving a non-compliant supplier is usually far worse than rejecting a compliant one. Write the asymmetry down, because it determines thresholds later.

01.3Boundaries and review gates

A boundary diagram shows what the system reads, what it writes, what it may recommend and what remains human work. Anything outside the boundary is an explicit assumption, not a silent gap.

Irreversible or high-impact actions need a review gate: a named role, a recorded decision and a way to override. Reversible, low-impact actions can be automated sooner.

Worked example

From "improve supplier selection" to a testable contract

Situation: A procurement lead asks for an AI tool that finds the cheapest qualified brake-pad supplier.

  1. 1Decision: award a 12-month contract for part BP-220 across three regions.
  2. 2Actions: award to one of five qualified suppliers, split award, or defer and request quotes.
  3. 3Utility: landed cost plus expected warranty cost plus stockout penalty, not unit price alone.
  4. 4Constraints: valid ISO/TS certificate, MOQ within storage capacity, export-control clearance.
  5. 5Evidence: quotes under 30 days old, certificates verified against issuer registry.
  6. 6Escalation: any award above the delegated limit or with a certificate expiring within 90 days goes to the category manager.

Outcome: The original request optimized the wrong quantity. The contract makes warranty exposure and MOQ visible and gives reviewers a pass/fail test.

Decision rules

  • If two reviewers would score the same output differently, the contract is not yet testable.
  • Never let the model choose the objective. The objective is set by the decision owner.
  • Every hard constraint must be checkable without the model.
  • Define abstention before defining success.
  • Irreversible actions require a named human approver.

Common pitfalls

  • Writing a contract that describes the model rather than the decision.
  • Omitting the "do nothing" or "defer" action, which forces a recommendation even when evidence is weak.
  • Treating latency or cost as soft preferences when they are real constraints.

Key vocabulary

Action set
The finite list of options the decision owner can actually take, including deferral.
Utility
A function that ranks outcomes by value to the owner, including costs and harms.
Hard constraint
A condition that may not be traded against utility under any circumstance.
Review gate
A recorded human approval step required before an action takes effect.

Tutorial outline

  1. 01.1Decision contract anatomy; decision versus answer; actions, states and outcomes; loss asymmetry; reversible versus irreversible decisions.
  2. 01.2System boundary diagrams; assumptions and exclusions; high-impact review gates.
  3. 01.3Worked example comparing a policy assistant answer contract with a supplier-selection decision contract.

Glossary

Decision contract
A testable agreement defining the action, objective, constraints, evidence, uncertainty and responsibility.

Required artifacts

Decision contract, boundary diagram, assumptions register and acceptance matrix.

Evaluation evidence

Reviewer confirms that actions, utility, constraints, evidence, uncertainty and escalation are testable and noncontradictory.