Package 19 · Section 8.3

Decision Theory Optimization and Value of Information

Choose an action and decide whether additional evidence is worth its cost and delay.

Track
E · Causal and decision intelligence
Level
Advanced
Version
v1.0
Status
In validation · catalog only
Explanation depthDepth

Learning objectives

  • Represent utilities, losses, constraints and risk attitudes.
  • Compute expected value and robust alternatives.
  • Estimate expected value of perfect and sample information.

In brief

Decision theory connects evidence, uncertainty and value into a recommended action. Value of information asks whether more evidence is worth its cost before deciding, turning "we need more research" into a quantified choice.

Core concepts

19.1Expected utility and constraints

Represent uncertain states with probabilities, actions with utilities per state, and choose the feasible action with the highest expected utility. Risk-averse owners can use utility curves or tail-risk constraints.

Optimization problems add continuous decisions such as order volumes, subject to capacity, cash and contractual constraints.

19.2Value of information

The expected value of perfect information (EVPI) is the most you should pay to remove all uncertainty. The expected value of sample information (EVSI) estimates the value of a specific test, audit or experiment.

If EVSI exceeds the cost of gathering the information, gather it before deciding. Otherwise decide now.

19.3Robustness

When probabilities are uncertain, check whether the best action changes across plausible ranges. Minimax regret chooses the action whose worst-case regret is smallest.

Report the thresholds at which the recommendation would flip.

Worked example

Should we audit before awarding?

Situation: Supplier A saves $180k per year but has a 20 percent chance of a certification problem costing $1.2M.

  1. 1EU(award A) = 180k − 0.2 × 1.2M = −60k. EU(award B) = 0.
  2. 2With perfect information: award A if no problem (80 percent), else B. Value = 0.8 × 180k = 144k.
  3. 3EVPI = 144k − 0 = 144k.
  4. 4An on-site audit with 90 percent accuracy costs 25k; EVSI ≈ 118k.

Outcome: Audit first. The memo shows that without the audit, B is preferred, and that the decision flips if problem probability falls below 13 percent.

Decision rules

  • Compute EVPI before commissioning research; if it is small, decide now.
  • Gather information only when EVSI exceeds its cost.
  • Report the flip threshold for every key uncertainty.
  • Use tail-risk constraints when losses are catastrophic or irreversible.

Common pitfalls

  • Requesting more research without valuing it.
  • Using expected value when tail losses are unacceptable.
  • Hiding the probabilities behind a single score.

Key vocabulary

EVPI
Expected value of perfect information: the upper bound on information value.
EVSI
Expected value of a specific, imperfect information source.
Minimax regret
Choosing the action with the smallest maximum regret across states.
Flip threshold
The parameter value at which the recommended action changes.

Tutorial outline

  1. 19.1Decision trees and influence diagrams.
  2. 19.2Expected utility, regret, minimax and risk measures.
  3. 19.3Information acquisition, stopping rules and sequential decisions.

Glossary

Value of information
The expected improvement in decision value from obtaining additional information.

Required artifacts

Decision model, sensitivity chart, value-of-information table and decision memo.

Evaluation evidence

Utility consistency, information dependence, cost inclusion and recommendation robustness.