Skip to content
Duoduo Mediaevidence to decision

Package 30 · Section 11.1

Agentic Decision Architecture

Decide where a language model belongs inside a decision system and which responsibilities must stay with deterministic orchestration, policy and execution layers.

Track
I · Agentic decision systems
Level
Practitioner
Version
v1.0
Status
In validation · catalog only
Explanation depthDepth

Learning objectives

  • Explain the closed decision loop: contract, plan, evidence, model, gate, act, monitor.
  • Place a use case on the six-level maturity ladder from answer system to adaptive closed loop.
  • Separate bounded model reasoning from control, evidence, decision, policy and execution responsibilities.

In brief

A production agentic decision system is a controlled software system. Language-model components propose plans, interpret evidence and explain results, while deterministic orchestration, governed data access, decision models, authorization, approval gates and monitored execution control what can actually happen. The model is a bounded reasoning component inside the system, not the system itself.

Core concepts

30.1The closed decision loop

Every case moves through the same loop: validate the decision contract, plan, retrieve and verify evidence, model alternatives, pass a risk gate, act, and monitor the outcome. The loop ends only at a defined terminal condition such as success, insufficient evidence, budget exhaustion, blocked by policy or waiting for approval.

Because the loop is explicit, each stage can be inspected, tested and replaced independently. A failure can be located at the earliest stage that went wrong rather than blamed on "the model".

30.2Layered responsibilities

The reference architecture has ten layers: decision contract, orchestration, planning, evidence, decision intelligence, tools, memory, risk and approval, execution and observability. Each layer has one design rule, for example "the workflow owns control; the LLM does not own the process" and "never infer success from a fluent tool response".

Authorization and version filtering happen in the evidence layer before content reaches the model, so the model cannot reason over information the user may not see.

30.3The maturity ladder

Systems climb from level 0 (answer system) through tool-using assistant, stateful workflow, decision agent and supervised action agent to level 5 (adaptive closed loop). Each level adds capability and adds required controls.

Most valuable enterprise decision work sits at levels 2 to 4. Level 5 is reserved for operational optimization where outcomes are fast, measurable and policy limits are tight.

30.4When agentic behavior is justified

Dynamic planning earns its cost when steps cannot be enumerated in advance, evidence must be reconciled across systems, intermediate results choose the next action, clarification or replanning helps, or the environment changes during execution.

Prefer a deterministic workflow when the sequence is known, rules are stable, failure consequences are high, or the model adds no planning value.

Worked example

Boundary review for a supplier recommendation agent

Situation: A team prototyped an agent that reads supplier quotes, chooses a supplier and emails a purchase order. It works in demos but procurement refuses to deploy it.

  1. 1Write the decision contract: owner is the category manager, actions are order, request documents or decline, constraints are cash, service level and certificate validity.
  2. 2Map the prototype onto the layers and find that the model owns the loop, calls the email tool directly and decides when it is done.
  3. 3Move control into a workflow graph, route evidence through an authorization filter and a claim ledger, and add a landed-cost simulation as the decision model.
  4. 4Add a procurement gate for new suppliers and exposure above the limit, and an idempotent RFQ tool instead of free-form email.

Outcome: The redesigned system sits at maturity level 3 for recommendations and level 4 only for preauthorized RFQs. Procurement approves a pilot because every action now has an owner, a policy check and a trace.

Decision rules

  • Reject an incomplete or contradictory decision contract before any planning starts.
  • The workflow owns control flow; the model may only propose.
  • Apply authorization and version filters before evidence reaches the model.
  • Separate prediction, causal effect and action selection.
  • Irreversible or high-impact actions require explicit authorization.
  • Every material recommendation must be reproducible from its trace.

Common pitfalls

  • Describing the system as "an LLM that plans and calls tools" and skipping the control layers.
  • Adding agentic planning to a process whose steps are already fully known.
  • Letting the model decide its own stopping condition.
  • Treating chat history as authoritative business state.

Key vocabulary

Agentic decision system
A governed stateful system that gathers evidence, models alternatives and proposes or executes permitted actions.
Bounded reasoning
Model reasoning whose inputs, outputs, tools and authority are limited by schemas and policy.
Decision contract
The testable definition of objective, actions, utility, constraints, evidence, authority and stopping conditions.
Terminal condition
A defined state at which the run stops, with a recorded reason.

Tutorial outline

  1. 30.1Why 'an LLM that plans and calls tools' is an incomplete description of a decision system.
  2. 30.2The ten architectural layers and the design rule that governs each one.
  3. 30.3When agentic behavior is justified and when a deterministic workflow is the better choice.

Required artifacts

Architecture diagram, maturity classification and boundary review.

Evaluation evidence

Responsibility separation, contract completeness, justified agentic scope and reviewer agreement on control ownership.