Capstone 27

Automotive aftermarket supplier decision

Choose a product-supplier-volume strategy for U.S. distribution.

Track
H · Industry capstones
Level
Advanced
Version
v1.0
Status
In validation · catalog only

You receive a partially working system, a decision contract, versioned datasets and hidden defects. Completion requires a reproducible implementation, inspection report, optimized configuration, decision analysis and executive presentation.

In brief

Choose products, suppliers and volumes for U.S. aftermarket distribution under stale logistics data, incomplete certificates, cash-cycle limits and long warranty tails. The capstone integrates evidence verification, optimization and Monte Carlo risk.

Core concepts

27.1Landed cost and tails

Landed cost includes unit price, freight, duty, inventory carrying cost and expected warranty cost. Warranty losses are heavy-tailed; plan with CVaR, not only expected cost.

Cash conversion constraints often bind before capacity does. Model them explicitly.

27.2Verification before optimization

Certificates, quality reports and freight quotes must pass freshness and authenticity checks before entering the optimizer. Correlated reports from one distributor count once.

Worked example

Portfolio with a cash constraint

Situation: Optimizer selects 14 SKUs from 2 suppliers; cash cycle limit $1.8M.

  1. 1Remove a supplier whose certificate cannot be verified.
  2. 2Re-optimize with CVaR(95) warranty limit.
  3. 3Sensitivity shows freight is the main flip driver.

Outcome: A split-award strategy with a freight-index trigger for re-sourcing.

Decision rules

  • Verify certificates before they enter the model.
  • Constrain warranty tail risk, not only expected cost.
  • State the freight level at which the recommendation flips.

Common pitfalls

  • Using a freight quote older than the contract horizon.
  • Optimizing on unit price alone.

Key vocabulary

Landed cost
Total cost of a product delivered to the point of sale.
Cash conversion cycle
Days between paying suppliers and collecting from customers.

Core risks

Stale logistics costs, incomplete certificates, correlated reports, cash-cycle constraints and warranty tails.

Required deliverables

Supplier scorecard, landed-cost simulation, audit value, robust policy and decision brief.

Milestones

  1. 1
    Contract and threat modelDecision boundary, actions, evidence, risk, access and escalation.
  2. 2
    BaselineReproducible run, test set, component metrics, traces and known limitations.
  3. 3
    InspectionRoot causes for hidden failures and regression tests.
  4. 4
    OptimizationQuality-cost frontier and selected policy under hard constraints.
  5. 5
    DecisionCausal assumptions, uncertainty, sensitivity and recommended action.
  6. 6
    ReviewExecutive summary, technical appendix and reviewer response.

Question set

5 questions. Answer all, then check to see explanations.

0/5
  1. Q1Supplier A is cheaper but has uncertain certification. What analysis fits first?
  2. Q2Why does certification-defect correlation not prove certification works?
  3. Q3A simulation shows stockouts rise sharply if lead time exceeds 6 weeks. How should this be used?
  4. Q4Which risk is specific to aftermarket parts?
  5. Q5What does the executive presentation need to show?

Answers in this view are not saved.

See it in practice

This capstone mirrors a real manufacturing engagement and the deliverables of our Decision Intelligence.